|
Note Sag in Roof Line |
HCRP BuildingSettlement Corrected Saving Owner $250kThe HCRP building was originally constructed as a construction field office and was originally considered temporary when constructed 15 years ago. Over time, significant settlement had occurred under the first and second column bays. The roof-line along the last bay had sagged over 5 inches, the interior floor slab had a noticeable slope and interior walls had deflected – all resulting in a dysfunctional structure. Obsidian’s Principals developed an investigation program and discovered approximately 20 feet of poorly compacted fill under the building. We were able to design a compaction grouting repair which saved the facility approximately $250,000 over the cost of a new building. This type of success demonstrates our ability to engineer creative solutions to building problems and develop cost saving recommendations. |
|
Note 4 inch Gap Between Wall and Ceiling |
|
|
Drilling Through Cinder Fill |
Smurfit-Stone Container P.O. Box 201 Hopewell, VA 23860 (804) 541-9683
Bruce Manson Project Engineer bmanson@smurfit.com
|